


CONNECTING KUWAIT'S FUTURE BY RAIL!
Under the leadership of Sheikh Meshal Al-Ahmad Al-Jaber Al-Sabah, the Kuwait-Saudi Arabia railway project is set to strengthen Kuwait’s transportation infrastructure and enhance regional connectivity. This project will make a significant contribution to the country's economic growth and logistical capacity. As part of the Gulf Cooperation Council (GCC) railway network, it marks an important step in positioning Kuwait as a key hub for regional trade.


Passenger Train Speed
200 KM/H

Freight Train Speed
120 KM/H


The Kuwait-Saudi Arabia railway project is of great significance for Kuwait as it strengthens the country's transportation infrastructure and enhances its regional and international trade connections. The project will modernize freight and passenger transportation, providing an alternative to road transport and supporting economic growth. Additionally, it will integrate Kuwait into the Gulf Cooperation Council (GCC) railway network, contributing to the country's ambition of becoming a logistics hub.


KUWAIT
NATIONAL
RAIL ROAD
ABOUT
KNRR PROJECT
Project Summary
-
Length of Planned Railway Network in Kuwait : 575 km long mainline
-
Length of the current GCC Component: 111 km long single track
-
Planned Railway Operation: Mixed Traffic (Both Passenger and Freight)
-
Passenger Train Speed: 200 km/h
-
Freight Train Speed: 120 km/h
Current Status:
The feasibility study has been completed, and the project is now in the design phase, with construction set to begin soon.
-
What is the Kuwait National Rail Road (KNRR) project?The KNRR is a major national infrastructure initiative that aims to develop a railway network across Kuwait and connect it with the wider Gulf Cooperation Council (GCC) Railway. It will support both passenger and freight transport.
-
What is the GCC Component of the KNRR?The GCC Component refers to the southern segment of the KNRR, linking Kuwait to the border with Saudi Arabia, and forming part of the broader GCC Railway that connects all six GCC countries.
-
Who is managing the KNRR project?The project is managed by the Public Authority for Roads and Land Transport (PART) in coordination with relevant Kuwaiti ministries and authorities.
-
Who are the consultants for the KNRR project?The consultancy for the KNRR – GCC Component is being delivered by Proyapı Engineering and Consultancy Inc., a leading international firm. A specialized team named Proyapı Railminds has been formed within the company to lead the project.
-
What are the main benefits of the KNRR project?The project aims to: Improve regional and domestic connectivity Support trade and logistics Provide a modern alternative to road transport Create jobs and stimulate investment Align with Kuwait Vision 2035 and sustainable development goals
-
What standards will the railway follow?The KNRR is being developed in accordance with the GCC Railway Common Guidelines to ensure full interoperability across the regional rail network.
-
When is the project expected to be completed?The KNRR project is being delivered in multiple phases. Timelines for construction and operation will be announced following the completion of design and tendering stages.